„Connected with the building of the development of the intermodal general aviation industrial logistical area with wide and normal rail gauge infrastructure from the present network to the border of the area he making of the necessary building plans according to the contractor's licensed plans, the implementation of the building works, making implementation plans, assemble of delivering and receiving documentation, authorizising of the use, achievement of the warranty obligation in the region of Fényeslitke-Komoró.In the course of the implementation comes true the building of a new wide gauge track from the Komoró' station old wide gauge track, with guarg and street lighting to the area's border (the official licensing section) and the complate renovation of the Fényeslitke railway station's normal gauge track and the building of the junction at the area's border ( not official licensing section). Permitted axle load is 250 kN on wide track, and 225 kN on standard gauge. Planning and construction speed of both track is 40 km / h.
Constractor: Swietelsky Railtechnic Ltd.
The specific content of the project :
1. Making of the implementation's plandocumantation
2. The with the track buildig concerned lines: the wide drag track of Komoró station, the normal track on the leftside next to the wide track, the engine around track of Fényeslitke railway station.
3.a) Track building on normal gauge
3.b) Track buildin on wide gauge
4.a) The building of overhead-wire on normal gauge
4.b) The building of overhead-wire on wide gauge
5.a) The building of street lighting on normal gauge
5.b) The building of street lighting on wide gauge
6.a) The building of guard on normal gauge
6.b) The building of guard on wide gauge
7.a) Art design on normal gauge
7.b) Art design on wide gauge
8. Track accessories