The existing power requirement of the industrial area is 2000 KVA that can be increase until 5000 KVA. 1300 meters newly built 22 kV 3x1x150 mm2 cabel, which will be built along the roads. 4 x 1,000-type transformer station installed with 630 kVA transformers. To ensure the coonection the transformer stations will be public. In the low-voltage districts of the transformer stations will be build 7 cable boxes who can start the interface cable. The low-voltage cables are 4x240mm2 big.
The low-voltage cables will be developed that they can be looped. The length of the low-voltage cable network - which will be developed - will be approximetly 1700 meters long.
The settling companies in the industrial area have to cooperate with EON Hungaria Ltd. by the planning of the consumer equipments.